
Lee (third from right) speaking with a resident over a retention pool that was upgraded to alleviate flash floods in Pasir Puteh, Ipoh.
ADDITIONAL measures will be taken to ensure flash floods that have been plaguing several areas in Pasir Puteh, Ipoh for decades will be resolved for good.
Pasir Pinji assemblyman Howard Lee said although a RM570,000 flood mitigation project was completed, there were still a few things to be done to ensure the problem would not recur.
Save 30% and win Bosch appliances! More Info
