PLANS are afoot to draw up a flood mitigation plan to tackle flash flood problems in Section 13, Shah Alam.
Shah Alam City Council (MBSA) Engineering Department acting director Hanif Basree Abdul Rahman said there was a drainage master plan drawn up for Section 13 in 2019 and the first phase of planning was being carried out now.