PETALING JAYA: The disruption of the Kelana Jaya LRT signalling system on Tuesday (Nov 8) evening was characterised by some trains "disappearing" intermittently from the monitoring screen of the LRT operation and control centre, posing a huge hazard, says Prasarana Malaysia.
This was revealed by Prasarana group CEO Mohd Azharuddin Mat Sah at a press conference here Thursday (Nov 10) morning, as he gave an update on the latest moves to solve the problem that is affecting the stretch covering 16 stations - from Kelana Jaya to Ampang Park - that began last Saturday (Nov 5).