Showing 230 results for "SMART Tunnel"
Order by:
Nation 15 Oct 2024 | 03:52 AM

SMART tunnel closed to traffic as flash floods hit KL

PETALING JAYA: The SMART Tunnel has been closed to road users as flash floods hit Kuala Lumpur.

Nation 15 Oct 2024 | 09:49 AM

SMART Tunnel reopens to traffic

KUALA LUMPUR: The SMART Tunnel is back in operation after it was closed on Tuesday (Oct 15) morning due to heavy rain here.

Metro News 28 May 2024 | 11:00 PM

RM350mil smart tunnel plan for PJ

AN UNDERGROUND passageway based on the SMART Tunnel concept has been planned under the Draft Special Area Plan (RKK) of Sections 19, 51 and 51A in Petaling Jaya, Selangor.

Nation 1 Dec 2022 | 11:00 PM

SMART Tunnel, wayward rain

KUALA LUMPUR: The Stormwater Man­agement and Road Tunnel, better known as the SMART tunnel, was built to prevent floodwaters from rising in Kuala Lumpur by channelling all the water to two designated catchment ponds.

Starpicks 10 Mar 2022 | 12:39 AM

Minimal flood impact for areas within Smart tunnel coverage

PETALING JAYA: The Stormwater Management and Road Tunnel (Smart) tunnel was designed to directly mitigate flooding issues within catchments associated with the overflowing of Sungai Klang passing through the Kuala Lumpur city centre to provide flood relief to areas such as Dataran Merdeka during heavy downpours.

Starpicks 21 Dec 2021 | 11:00 PM

SMART TUNNEL STRETCHED BEYOND THE MAX

THE Stormwater Management and Road Tunnel (SMART) tunnel diverted five million cubic metres of water – despite three million cubic metres being its maximum capacity – to prevent major floods in KL city centre over the weekend.

Nation 22 Oct 2021 | 07:11 AM

Inspection carried out on SMART Tunnel to face inter-monsoon season

KUALA LUMPUR (Bernama): The Stormwater Management and Road Tunnel Sdn Bhd (SMART) has conducted a comprehensive inspection and monitoring of flood and road gates as well as watertight gates in preparation for the inter-monsoon weather that could bring heavy rain unexpectedly.

Nation 11 Dec 2022 | 12:44 AM

SMART Tunnel reopened after two-hour closure for flood mitigation

KUALA LUMPUR: The SMART Tunnel resumed operations after being closed for over two hours following heavy rain in the Klang Valley since 5 pm.

Business 5 Feb 2025 | 09:43 AM

PKNPK, Gamuda in pact to address critical water shortages in northern Perak

KUALA LUMPUR: Perbadanan Kemajuan Negeri Perak (PKNPk) and Gamuda Bhd have signed an exclusive arrangement with the intent to develop an infrastructure to address critical water shortages in Northern Perak.

Metro News 12 Oct 2022 | 04:09 AM

Smart Tunnel closed due to morning downpour

THE Smart Tunnel from Cheras, Seremban, Taman Desa into KL City is closed due to the morning downpour that affected the Klang Valley on Wednesday (Oct 12) morning.

Nation 19 Dec 2021 | 01:46 AM

Smart Tunnel closed due to flood system activation

KUALA LUMPUR: The Syarikat Mengurus Air Banjir dan Terowong Sdn Bhd (Smart) tunnel is closed to users for the activation of the flood system following heavy rains since Friday (Dec 17).

Nation 21 Dec 2021 | 07:21 AM

SMART Tunnel reopens to traffic

KUALA LUMPUR: The SMART Tunnel has been reopened to traffic from 11.10am Tuesday (Dec 21) after completion of cleaning works.

Nation 7 Mar 2022 | 11:49 AM

Flood: Smart Tunnel fully closed for mitigation operations

PETALING JAYA: Kuala Lumpur City Hall's (DBKL) Integrated Transport Information System (Itis) announced that the 9.7km Smart Tunnel is closed fully for flood operations.

Starpicks 11 Feb 2022 | 11:00 PM

SMART TUNNEL MITIGATES 45% OF KL FLOODS

THE recent torrential downpours throughout the peninsula saw the country battling one of the worst floods in a decade.

Nation 4 Feb 2022 | 08:02 AM

Govt considers building SMART tunnel in Shah Alam

PUTRAJAYA: Shah Alam may be getting a SMART tunnel system as a solution to mitigate floods in the area, says Datuk Seri Ismail Sabri Yaakob.

Metro News 12 Sept 2020 | 12:20 PM

SMART Tunnel reopened to traffic

STORMWATER Management and Road Tunnel (SMART) has reopened the SMART Tunnel at 6.37pm this evening following a major clean-up work that was undertaken in the aftermath of Thursday's downpour (Sept 10).

Telcos 17 Aug 2020 | 11:00 PM

U Mobile powers Waze in SMART Tunnel

KUALA LUMPUR: With U Mobile’s latest partnerships with Waze and SMART Tunnel, it has become the first telco in the world to power Waze in SMART Tunnel which will provide drivers undisrupted GPS connectivity through the 5.2km tunnel.

Nation 22 Nov 2023 | 11:57 AM

TRX tunnel to open Nov 29, expected to reduce traffic by 30%, says Nanta

KUALA LUMPUR: The opening of the five-kilometre Tun Razak Exchange (TRX)  underground tunnel on Nov 29 is expected to reduce traffic into the city by 30%, said Works Minister Datuk Seri Alexander Nanta Linggi. 

Metro News 19 June 2022 | 11:00 PM

‘Tunnel not answer to JB’s flood problem’

JOHOR Baru city does not need a SMART Tunnel to mitigate flash floods like in the Klang Valley, says an expert.

Starpicks 19 Mar 2022 | 11:00 PM

Finding a SMART solution to floods

A proposed SMART tunnel system may be the answer to ease Shah Alam residents woes.

Next Page
All Headlines:

Want to listen to full audio?

Unlock unlimited access to enjoy personalise features on the TheStar.com.my

Already a member? Log In