CHRISTOPHER TAN, CAVINA LIM, LOGEISWARY THEVADASS, R. SEKARAN, KHAIRANI QALBI and M. DARISHINNI MATHURA at the Penang State Assembly
THE elevated Light Rail Transit (LRT) was chosen after a further study on soil investigation showed that an ‘at-grade’ (ground level) and ‘underground’ transit system was not suitable for the Bayan Lepas LRT line.